Street Market, Kiev, Ukraine, September 10, 2011

Friday, July 10, 2009

More Church Construction Photos

These are from the 3rd floor, where I did not go. I'm a chicken, am afraid of heights and just could not make myself go up those stairs to the 3rd floor. Going up would have been fine - it's the coming back down that would have scared me to pieces. :) I gave the camera to Mel and he took these. Not sure which direction is which, other than the triangle window which is over the front of the church.

Stairs up to 3rd floor View 1 View 2 View 3 View 4 - this area may become the library, it is at the head of the stairs View 5 View 6 - the area under the skylight is supposed to become the office. They will have to do something about all of that open space. Mel is very disappointed in how shoddy the skylight looks. Hopefully they will fix it some how. And back on the main floor, (1) a pile of bricks and (2) the gate which will go in the fence in front of the steps


In the previous post is a photo of the sanctuary which shows various parts of the roofing, waiting to be put up. On the left side of the sanctuary are piles of insulation sheets and other stuff.

And that is a quick tour of what everything looks like as of July 10.

:) :) :)

No comments: